Home Up Services Contents Search Photos Webcams Contact Information
 

Flowers & Associates, Inc.

_______________________________________________________________________

Civil Engineers

 

 

PROJECT ORGANIZATION

§         Project Scope and Goal Definition

§         Organization & Coordination of Multidisciplined Consultant Teams

§         Project Schedule Evaluation (CPM, Bar Chart, etc.)

PLANNING & STUDIES

§         Master Planning and Scheduling

§         Cost Estimating

§         Land Planning

§         Feasibility Studies

§         Water Supply Facilities Analysis

§         Storm Drainage and Flood Analysis

§         Systems Analysis and Process Evaluation

DESIGN

§         Roadways

§         Parking Lots

§         Water Supply & Distribution

§         Wastewater Collection

§         Storm Drainage Collection, Treatment & Conveyance

§         Water, Sewer & Drainage Pipelines

§        Commercial/Residential Site Development

§         Creek and River Bank   Stabilization

§         Hydraulic Control Structures

§         Pumping Stations

CONSTRUCTION REVIEW

§         Constructability Review

§         Construction Contract Administration

§         Construction Observation and Documentation

§         Schedule Evaluation

These projects typically involve the preparation of detailed grading, drainage, and paving plans for sites encompassing a wide range of landscape and / or outside living area development features.  The parcels have ranged in size from 1 to more than 20 acres and often feature areas of retained native vegetation or enhanced existing natural elements.

     

Project

Client or Owner

Size*

Scope **

 

 

 

R

P

D

C

Picacho Lane

Individual

3

 

x

x

 

Garden Lane

Individual

3

x

 

x

x

East Valley Road

Kadri & Associates / Snider

5

x

x

x

x

Via Roblada

Individual

24

x

 

x

 

Edgecliff Lane

Individual

1

x

x

x

x

Edgecliff Lane

Individual

1

x

x

x

 

Lilac Drive

Individual

1.7

x

 

x

 

Park lane

Individual

1.5

 

x

x

x

Happy Canyon Road

Individual

100

 

X

x

 

Cima del Mundo

Individual

46

 

x

x

 

Tiburon Bay Lane

Individual

½

 

x

x

 

Lambert Road

Individual

29

x

x

x

 

East Mountain Drive

Individual

2

 

 

x

 

Stonehouse Lane

Individual

1.7

 

 

x

 

East Mountain Drive

Individual

7

 

x

x

 

Sycamore Canyon Road

Individual

10

 

x

 

 

East Mountain Drive

Individual

20

 

x

x

 

Lilac Drive

Mon-Arc Designs, Inc.

2.5

 

x

x

 

Ortega Ridge Road

Berkus Design Studio

1

x

x

x

 

Toro Canyon Road

Don Nulty, AIA

5

x

x

x

 

Cima del Mundo

Individual

11.2

 

 

x

 

East Mountain Drive

Individual

1

x

 

x

 

Calle Real

Individual

100

 

x

x

 

Cresta Avenue

Individual

2.5

X

X

X

 

East Mountain Drive

Individual

/

 

 

X

 

East Valley Road

Individual

2

 

X

X

 

 
* Project Size Key:
Approximate site acreage

**Project Scope KeyR = Rehabilitation P = Planning D = Design C = Construction