City of SB Carrillo Hill Sidewalk
Project Description
For the Carrillo Hill Sidewalk Improvements Phase 1 Project, the City of Santa Barbara was interested in providing a continuous pathway for at least one side of Carrillo Street and Meigs Road to enhance and increase pedestrian travel and to increase transit use by providing better access to bus stops. The project consisted of both curb adjacent and meandering concrete sidewalk, landscaped parkway, curb and gutter and access ramps at three (3) intersections on the north side of the street. Retaining walls were also constructed to accommodate existing topographical variations. A number of conforms were also incorporated at various properties to accommodate existing conditions. The project also included landscaping and street lighting.
This project required the coordination of Civil, Landscape Architect, Structural, Electrical and Traffic Engineering disciplines.
Project Description
For the Carrillo Hill Sidewalk Improvements Phase 1 Project, the City of Santa Barbara was interested in providing a continuous pathway for at least one side of Carrillo Street and Meigs Road to enhance and increase pedestrian travel and to increase transit use by providing better access to bus stops. The project consisted of both curb adjacent and meandering concrete sidewalk, landscaped parkway, curb and gutter and access ramps at three (3) intersections on the north side of the street. Retaining walls were also constructed to accommodate existing topographical variations. A number of conforms were also incorporated at various properties to accommodate existing conditions. The project also included landscaping and street lighting.
This project required the coordination of Civil, Landscape Architect, Structural, Electrical and Traffic Engineering disciplines.